الجمعة، 11 فبراير 2011

the every 6 months transformer preventive maintenance

 the every 6 months transformer preventive maintenance

- pressure test for sealed tarnsformer ( look for leakage in nitrogen pressure )

- oil test take sample and checkgas in oil" analysis

- ground resistance test ( check protective relay ensure good grounding )

- check calibration to ensure working as the best

- check  all main connection cables

- infra-red check look for hot spots, loose connection damage porcelains

- check fire control ( make sure it operates correctly ).

- bushing cleaning (if the bushing have been covered in protective grease, clean and replace if in heavy polluted area the treatment by poweder blast cleaning ).

ليست هناك تعليقات:

إرسال تعليق